| Headworks | |||
Effective headworks equipment brings great economic value to a wastewater plant. Removing the most particles as early as possible inline prevents operational problems later. Installation of top-quality headworks equipment will protect downstream pumps, clarifiers, thickeners, and digesters from abrasion and clogging. Click to view Headworks products: |
|
||
| Infilco Degremont, Inc. P.O. Box 71390 Richmond, VA 23255-1390 Tel: (804) 756-7600 Fax: (804) 756-7643 ©2007 Infilco Degremont, Inc. All rights reserved. |
|||